How to install the three roller gate? Three roller gate installation guide

How to install the three roller gate? The intelligent three roller gate is the main control device of the human flow channel, mainly by the standard chassis, the main control circuit, the movement part of the movement, the aluminum plate, the gate bar, the motor, the transformer and the reset unlocking photocouple, the drop And on the rod assembly part. This is a certain degree of difficulty for some inexperienced three-roll gate installers. The following Xiaobian has compiled the three-roll gate installation information for your reference.

Three roller gate

Tri-roller gate preparation before installation:

1. Before the installation of the three-roll gate, reasonable plans should be made. For example, depending on whether the installation site is open or indoor, choose whether to avoid rain; according to the width and length of the on-site passage, specify the type and quantity of the three-roll gate, etc.; according to the master computer and the three-roll gate The distance to choose the wiring method, is to take the line or go dark line.

2. Without permission, do not add peripheral equipment on the equipment and ensure that the equipment is grounded reliably to ensure the safe and reliable operation of the equipment;

3. When the equipment is used outdoors, a cement installation platform with a height of 100mm to 200mm should be installed at the installation location of the equipment in order to prevent tides; at the same time, rain protection facilities such as sunshades should be installed above the equipment. It is recommended not to install the equipment directly. Used in open air environments;

4. When installing, please open the cover of the chassis, connect the ~220V power supply, and ground it reliably. When everything is ready, close the air switch and turn on the main board L5. The L6 lamp is on, the motherboard number pipe shows “RUN”, the lift rod is raised, and the gate is in working condition.

5. The bottom of the three-roll gate shall be fixed with expansion screws and shall not be rocked. The appearance of the whole machine shall be uniform and adjusted one by one until it can be used normally. The three-roll gate shall be placed horizontally to the ground so that the effect and the life of the three-roll gate will be at their best.

6. Check if the chassis is grounded. The three-roll gate housing is mostly made of stainless steel. If the housing is not grounded, it will cause great safety hazards to the user's personal safety.

7. When the external control system (access control, fingerprint, etc.), please determine what kind of signal output by the controller (dry contact, active output, etc.) dry contact output, as long as the two lines are connected to the OPEN-L of the gate. , OPEN-R and VDD can be, according to the specific requirements of the customer; active output, we must first determine the output signal "+" "-", "+" one end connected to the OPEN-L or OPEN-R, "--" is connected to the motherboard's "GND" (voltage range: 5V ~ 12V).

Three roller gate

In addition, the maintenance and service of the three-roll gate directly affects the service life of the three-roll gate. Therefore, regular maintenance and maintenance of the three-roll gate must be done regularly, and it should be done as required. Many users rarely maintain or even do not maintain it at all. Only when the machine is broken, does it think of the manufacturer and only then replace the components. This is often due to small losses, usually there is no maintenance, a little bit of a small problem, a long time will provoke a big problem, so the majority of new and old customers must understand the importance of the maintenance of the triple roller gate. General maintenance note the following points:

1. External maintenance Most of the three roller gates are made of domestically produced SU304 stainless steel. Once a week, the exterior surface is cleaned, rust spots are removed, the surface of the chassis is polished with a soft cloth and fossil powder, and anti-rust oil is applied. The paint has just been applied. Rust oil should not be rubbed by hand. Wait 3-5 hours for natural drying and hand contact. Otherwise it will destroy the effect of surface rust prevention. If it is sprayed on the exterior, wipe out the dust on the outside and expose the scratches. Use the same color paint to make up for it, or use the car's Lidobe for repair.

2, movement maintenance movement is the heart of the machine, must be maintained well. It is generally maintained once a month. Open the top cover to cut off the power supply, clean the dust, and then clean the drive section and add butter or high-consistency oil. Check whether the fasteners are loose, tighten the fasteners, check the wear of the wearing parts, positioning arm and positioning plate more than 3mm, replace the above gaps in time, normal clearance (1-1.5mm), solenoid valve The proper addition of butter or oil in the core, so that the solenoid valve in the left and right movement is to reduce the resistance, get the lubrication, not too much, should be appropriate.

Halbach Ring Array5Halbach Ring Array4Halbach Ring Array6c954bd722f27265eb75e25293129f46



Halbach Array


  A Halbach array is a special arrangement of permanent magnets that augments the magnetic field on one side of the array while cancelling the field to near zero on the other side. This is achieved by having a spatially rotating pattern of magnetization.

  The rotating pattern of permanent magnets (on the front face; on the left, up, right, down) can be continued indefinitely and have the same effect. The effect of this arrangement is roughly similar to many horseshoe magnets placed adjacent to each other, with similar poles touching.




Halbach Array

Halbach Array,Neodymium Halbach Array Magnet,Motor Halbach Array,Magnetic Bearing Halbach Array

Chongqing Great Well Magnet Co.,ltd. , https://www.gwmagnet.com