How to write a kindergarten decoration contract? Kindergarten renovation contract template

Kindergarten decoration will be implemented by a professional tooling company, and after finding a tooling company, it is necessary to sign a kindergarten decoration contract before the construction can be carried out. Then how to write the kindergarten decoration contract? The following decoration home decoration network Xiaobian will bring you a kindergarten decoration contract model, I hope to be helpful to everyone.



幼儿园装修合同



Kindergarten renovation contract


Party A (contractor):

Authorized representative of Party A: ID card number:

Party B (contractor):

Authorized representative of Party B: ID card number:


Project: Interior decoration of a kindergarten.


In accordance with the "Contract Law of the People's Republic of China" and relevant laws and regulations, combined with the characteristics of the kindergarten interior decoration project, Party A and Party B decided to entrust Party B to carry out interior decoration after friendly negotiation and negotiation. In order to ensure the smooth completion of the project, this contract is signed for mutual compliance.


Article 1: Project Overview


1. Project address: ________ Entrustment method: ________


2. The interior decoration area is about ____ square meters. (See the construction drawing and structure drawing of the house for details)


3. Project start date: ____ year __ month __ day; project completion date: ____ year __ month __ day


Article 2: Engineering price


The project price budget totals RMB (amount capitalized) ______ yuan, (a small amount) ______ yuan. The specific project final settlement amount is approved after reference to the "decoration project final statement". (Material price refers to the same period of 2017 decoration project cost information and market price)


Article 3: Quality requirements


1. The variety, specification and name of the main materials used in the project shall be approved by both parties; the project acceptance criteria shall be implemented by both parties in accordance with the relevant provisions of the State.


2. During construction, if Party A has special construction projects or special quality requirements, both parties shall confirm that the additional costs shall be signed by a supplementary contract; the quality of the materials, equipment and products purchased by Party B shall be borne by Party B; Party B is responsible.


Article 4: Material supply


1. Party B shall strictly follow the relevant national price regulations and impose a clear price on the materials used in this contract. The materials provided by Party A shall be applied to the decoration works stipulated in this contract, and may not be used for other purposes without the consent of Party A. If Party B uses it for other purposes, Party B shall compensate Party A according to the double price of the misappropriated materials.


2. Materials and equipment provided by Party B shall be prohibited if they do not meet the quality requirements or have different specifications. If it has been used, Party B shall be responsible for the losses caused to the project.


3. The materials shall be kept by Party B, and Party B shall be responsible for the losses caused by improper storage.


4. After the completion of the project, Party B shall provide Party A with a quality inspection report for all decoration materials and relevant bills for the use of the main materials.


Article 5: Payment method


1.____Year__月__Day water and electrician enters the market, Party A pays Party B's project RMB ______ million yuan; woodwork enters the market, Party A pays Party B's project RMB ______ yuan; the project is completed, Party A shall pay Party B the construction cost of RMB ______ yuan; the final payment of RMB 10,000 yuan shall be used as the decoration quality guarantee. After one year, if there is no quality problem in this decoration project, Party A shall return this deposit to Party B.


2. The unpaid project payment of this project will not pay interest; if there is any increase or decrease of the project during construction, the two parties shall sign a supplementary contract, and Party B shall be responsible for notifying the person in charge of the construction site. Increase or decrease the price of the project and finally settle it together.


Article 6: Project Duration


Project completion date: ____ years __ month __ days. Party B shall ensure that all major engineering projects such as waterworks, electricians, bricklayers, carpentry and painters must be completed by _________. The relevant personnel of the tail project must be evacuated from the construction site before the ____ __ day; if the delay is completed due to Party B, Party B shall pay Party A a penalty of RMB 10,000 for each delay.


Article 7: Project acceptance


In addition to the concealed works requiring partial acceptance, after the completion of the project, both parties will organize the quality inspection department to complete the acceptance check. After the acceptance is passed, the two parties handle the handover procedures. (If Party A disagrees with the quality of the decoration, the two parties will sign a supplementary agreement to resolve it amicably.)


Article 8: Other matters


1. Party A's responsibility: A floor plan approved by the property management department must be provided.


2. Party B's responsibility:


1) Proactively present the business license, membership certificate or construction qualification; the salesman must have the entrusted certificate of the legal representative; assign a staff member to be the B site representative, be responsible for the contract performance, and organize the construction according to the contract, guarantee the warranty Complete the construction tasks on time and in quantity.


2) Responsible for the safety of the construction site, prevent fires, affiliation, civilized construction, and prevent accidents caused by construction, such as pipeline blockage, water leakage, power outages, and damage to items. In the event of a failure, it is necessary to be responsible for repair or compensation as soon as possible.


3) Strictly perform the contract and implement the credit period. If the work is delayed due to delays, such as taking off materials, working or borrowing, it will induce Party A to pay the funds. After the report is verified, it will be treated according to the breach of contract; within the scope of decoration and construction, the warranty is guaranteed. The date of the completion of the project shall be based on the warranty period provided by Party B.


Article 9: Liability for breach of contract and dispute resolution


After the contract comes into effect, any party who fails to perform the payment as stipulated in this contract shall be deemed to have breached the contract, and the defaulting party shall pay the other party RMB 10,000 yuan as liquidated damages. During the performance of the contract, if the contract is terminated without authorization, RMB 10,000 yuan shall be paid as a liquidated damages to the other party. Compensation shall be made for the unreasonable termination of the contract and the actual loss caused by the other party exceeding the liquidated damages.


During the performance of this contract, if disputes arise between the two parties, the parties shall resolve the dispute without affecting the progress of the project. If the parties are unwilling to resolve through negotiation or when the settlement is not resolved, they may file a lawsuit in the people's court where the contract is signed.


Article 10: Change, Termination and Contract Effectiveness of the Contract


After the contract is signed by both parties, the parties must strictly abide by them. If any party needs to change the content of the contract, it shall re-sign the supplementary agreement after mutual agreement. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall submit it in writing and pay the RMB 10,000 yuan liquidated damages to the other party, and at the same time handle the termination of the contract.


This contract and the contracted parties shall be effective after signing; the supplementary contract shall have the same legal effect as this contract; this contract shall be in duplicate, and each party shall hold one copy.


Party A (signature): Party B (signature):


Authorized representative of Party A: Authorized representative of Party B:


Date: Date:


The above is how to write the kindergarten decoration contract that Xiaobian brought to you? The entire contents of the kindergarten decoration contract model, I believe that after reading this article, you have a basic understanding of the kindergarten decoration contract, if you want to know more about decoration consultation, please click to enter the decoration knowledge channel.

More related wonderful reading:

How to properly decorate the kindergarten? Kindergarten decoration plan Daquan

How to design an excellent kindergarten? Kindergarten design attention points

How much is the kindergarten decoration? Detailed explanation of kindergarten decoration costs

What kind of decoration style is suitable for kindergarten? Kindergarten decoration style summary

What feng shui problems do kindergartens pay attention to? Kindergarten Feng Shui Daquan

Carbon Electrode Paste is produced by putting Petroleum Coke and asphalt into melting tank to dehydration, melt, then adding them into kneading pot to kneading, molding and sintering. 

Fully automated batching, crushing, mixing, kneading, molding, quality assurance, strict control of ash content, volatile, ensure low resistance and high strength.

Materials:Calcined Anthracite Coal,CPC,Anode Scrap,Coal pitch,Coal Tar,Graphite Powder.

Shape:Cylinder,Egg,Trapezoid.

Application:Used in soderburg furnace to make Various alloy, such as Ferro silicon, ferro manginess, ferro silicon manganese,nickel alloy, Chromium alloy.

Electrode Paste

Electrode Paste,Electrode Paste Standard,Airtight Electrode Paste,Special Carbon Electrode Paste

Carbographite Industrial PTE.LTD , https://www.carbographite.com