Construction Scaffolding Steel Prop Accessories China Made Good Quality

  • Model NO.: TJ0004
  • Structural Style: Doors Scaffolding
  • Supporting Mode: Floor Type Scaffolding
  • Move Method: Integral Lifting Scaffolding
  • Construction Properties: Installation Scaffold
  • Thickness of Tube: 1.6-3mm.
  • Origin: Qingdao China
  • Material: Metal
  • Framework: Frame Combined Scaffolding
  • Lapping Form: Double Scaffolding
  • Scaffolding Part Type: Scaffolding Frames
  • Surface Treatment: DIP Painted, Powder Coated, Electro Galvanized, Ho
  • Trademark: TJ
  • HS Code: 87169000



Specifications
scaffolding steel prop accessories factory
Material:Q235
pin,nut,screw,plate
painted,galvanized,powder coated
high quality
Scaffolding prop accessories
Size OF NUT:
Height :30mm  40mm or as customized
Thickness:5mm,8mm 10mm or as customized
Diameter:48mm  56mm 60mm 70mm or as customized
Cup Shape Nut
Height:135mm 140mm or as customized
Thickness:3mm 4mm 5mm or as cusomized

Diamater:48mm  56mm
Screw:
Height:195mm 200mm 210mm etc.
Thickness:2--4mm

pin
Diameter:1cm, 1.5cm or as customized

Name H Frame Scaffolding
Place of Origin qingdao, China
Brand Tianjiu

Size
(more customized size available)

Type
Length(mm) Width(mm) Tube Thickness(mm)

BY1930

1930
1219 2/2.2

BY1700

1700
1219 2/2.2
BY1524 1524 1219 2/2.2
BY14 1700 914 2/2.2
Material Q235 carbon steel
Surface treatment Hot Dip Galvanized(HDG); cold galvanized; powder coated; dip painted
Color Orange, dark red, blue, or as you required
Welding technique CO2 arc Welding
Certification SGS;BV,CIQ
MOQ(Minimum Order Quantity) 1 20ft container;please contact us if you need less than 1 20ft container.
Payment T/T
Delivery time 20days after deposit
Package Without outer packing or as you required
Production capacity 100 tons for each day


Products Name

Scaffolding System

Material

Q235, Q345

Surface treatment

Hot-dip galvanized, Electroplate galvanized, painting.

Place of origin

China

Size

As the customer's requirement

Color

Silver, Red, Customized.

MOQ

100 pieces

Payment

T/T, consider L/c if long cooperation

Delivery time

25-30 days after the confirmation

Packing

In bulk, steel pallet or according to customer's requirement.

Production capability

50000 piece/month

Certificate

ISO9001

Market